Julian Sanchez of Ars Technica, Erica Sadun, and UC Irvine computer science professor David Eppstein have cracked the code to all the glyphs that appear just before each commercial break during an episode.In most cases it is a single word that ties into the theme of the episode so sadly it doesn't seem to provide the hints towards "The Pattern" as hoped. Read the links above for the details on how they did it or just use the picture (from Fringe Television) to determine the word for future episodes.
The words to date:
1: OBSERVER
2: CHILD
3: AEGER [? -- AETHER would make more sense for the episode]
4: ROGUE
5: SURGG [should be SURGE?]
6: CELLS
7: CODES
8: TAKEN
9: VOICE
10: TRADE
11: SAVED
12: BISHOP
13: AVIAN
14: OLIVIA
No comments:
Post a Comment