The final five episodes of the season are planned, probably already shot, and apparently full of answers that likely lead to more questions about the Pattern as the descriptions below from SF Universe seem to indicate.
Unleashed (Air Date: 4/14/08)
As animal rights activists ransack a laboratory, they get more than they bargained for when one of the caged “animals” unleashes a ferocious appetite. Leaving grotesquely mutilated dead bodies in its wake, the scientific engineered beast – with the body of a lion, claws of an eagle, fangs of a viper, skin of a rhinoceros and tail of a serpent – attacks Charlie. With Charlie’s life on the line, Walter must come face-to-face with both his past and the beast.
Bad Dreams (Air Date: 4/21/08)
Episode Written and Directed by Academy Award-winner Akiva Goldsman (“A Beautiful Mind”)
As a suicide incident occurs at New York’s iconic Grand Central station, Agent Dunham simultaneously witnesses the event while asleep and dreaming in Boston. Rattled by the extraordinary and coincidental circumstances, Olivia, Peter and Walter investigate further, but keep coming up empty-handed. As these violent occurrences continue and worsen, Olivia is sent into an unthinkable direction and shocking details emerge about the ZFT manuscript, the highly experimental drug Cortexiphan and Olivia’s childhood.
Midnight (Air Date: 4/28/08)
Fringe Division is on the case when severely mutilated bodies drained of spinal cord fluid begin to pile up. After their investigation leads them to a scientist (guest star Jefferson Mays) with possible ties to the Z.F.T. bioterrorist cell, they are shocked to discover the identity and motive of the killer. When the kills occur with increasing frequency, Olivia (Anna Torv), Peter (Joshua Jackson) and Walter (John Noble) go to desperate lengths to stop them.
The Road Not Taken (Air Date: 5/5/08)
First her bad dreams became reality, and now Olivia is “dreaming” while awake, seeing elaborate bleak visions of things not really there. While investigating the disturbing case of a woman who apparently spontaneously combusted, Olivia throws caution to the wind and mines her unexplained visions for clues. Meanwhile, Walter comes clean about his prior knowledge of the Z.F.T. manifesto, and Peter’s secret project is revealed and yields surprising help in unraveling the mystery.
There's More Than One of Everything (Air Date: 5/12/08)
The sudden and unexpected attack on someone with close ties to Fringe Division, the return of bioterrorist David Robert Jones (guest star Jared Harris) and the inexplicable disappearance of Walter set the stage for a non-stop, nail-biting season finale of FRINGE. Questions will be answered, observations made, loyalties tested and truths and identities revealed.
This is the season finale were Leonard Nimoy is expected to appear in at least one scene (probably at the end).
No comments:
Post a Comment