Finn
"Sometimes, heroes come from the unlikeliest of places. The Galactic Empire has been dead for decades, but evil never really dies. With villains rising to take the Empire's place, heroes must rise to oppose them.Rey
After becoming stranded by himself in the deserts of Jakku, and meeting up with a girl named Rey, a Stormtrooper named Finn has joined the side of the Resistance. He began his adventure as a part of the New Order, but now he's one of the few people that can stop them.
With a new look, Finn is ready for a new mission. Since trading in his Stormtrooper armor for a new set of gear, Finn's outfit might not be flashy, but it's all that a hero needs to succeed."
"The mission to take down the First Order is underway! After invading the Starkiller Base, one member of the Resistance has split from her group and found herself in a massive room full of First Order soldiers.Starkiller Base
Completely surrounded by Stormtroopers with blasters and Knights of Ren with lightsabers, she seems to be totally outnumbered. Unfortunately for her enemies, though, they've made a big mistake: it's not about the strength of the weapon, but the strength of the warrior that wields it."
"An ice planet converted into a stronghold of the First Order and armed with a fiercely destructive new weapon capable of destroying entire star systems."New Characters
Resistance star fighter mechanic Goss Toowers and his co-worker B-U4D, Resistance tactical co-ordinator PZ-4CO, intergalactic criminal kingpin Tasu Leech, the scavenger and trader Sarco Plank, the skilled if reckless Resistance pilot Ello Asty
No comments:
Post a Comment