July 26th, 4:45-5:45 Fringe Q&A and Trailer Screening— J. J. Abrams (Lost), Roberto Orci and Alex Kurtzman—the team behind Mission: Impossible 3, Alias, and the upcoming Star Trek feature—join fellow Fringe executive producers Bryan Burk (Cloverfield) and Jeff Pinkner (Lost), as well as stars Anna Torv (The Pacific), Josh Jackson (Shutter), and John Noble (The Lord of the Rings: The Return of the King), for an exclusive Q&A about one of the most anticipated new television series of the fall season, a drama that will thrill, terrify and explore the blurring line between science fiction and reality. The session will kick off with the screening of a trailer for the series. Television Week deputy editor and columnist Joe Adalian moderates. From Bad Robot Productions in association with Warner Bros. Television, Fringe premieres September 9 and airs Tuesdays at 9:00 PM on FOX. Ballroom 20
July 26th, 6:30-7:30 WildStorm Brewing— Get the inside scoop on what’s coming up from DC’s wildest imprint from VP Hank Kanalz, superstar artist Jim Lee, editorial director Christos Gage (WildCats: World’s End), and creators Neil Googe (WildCats: World’s End), Wes Craig (Wildstorm Revelations), Brian Denham (X-Files), Joshua Ortega (Gears of War), and Jason Craig (Freddy vs. Jason vs. Ash). Find out about WildStorm’s newest creator-driven books, plus the latest on The Authority, WildCats, Stormwatch, Gen 13, The Lost Boys, X-Files, J. J. Abram’s Fringe, and much, much more! Room 8
July 26th, 6:00-7:00 Exceeding Expectations and Exploring New Worlds: Feature Effects for the Small Screen— Zoic Studios moderates a discussion with VFX supervisors on their passion for creating narrative enhancing, eye-popping effects for television. Some of the best in the business discuss future trends as well as their contribution to the television series Heroes, Battlestar Galactica, The Middleman, Lost, Eureka, Terminator: The Sarah Connor Chronicles, Smallville, and the new fall show Fringe. Room 32AB
Monday, July 14, 2008
SDCC Fringe Panel
The San Diego Comic-Con finally released its full Saturday and Sunday schedule. As part of that Fringe will have its own panel to go along with the screening of the pilot episode on Thursday. In addition Wildstorm has its panel which will include discussion of the Fringe comic books series from the publisher. Finally, Zoic Studios will have a panel discussion its FX works for various television programs including Fringe.
No comments:
Post a Comment