6:00–7:30 and 7:30-9:00 Fringe Pilot Screenings—Comic-Con and Warner Bros. Television proudly present two exclusive premiere screenings of the pilot episode of Fringe, the highly anticipated new FOX series from J.J. Abrams (Lost), Roberto Orci and Alex Kurtzman, the team behind the upcoming Star Trek feature, Mission: Impossible 3 and Alias. When an international flight lands at Boston’s Logan Airport and the passengers and crew have all died grisly deaths, FBI Special Agent Olivia Dunham (Anna Torv, The Pacific) is called in to investigate. When the search nearly kills her partner, Special Agent John Scott (Mark Valley, Boston Legal), a desperate Olivia searches frantically for someone to help, leading her to Dr. Walter Bishop (John Noble, The Lord of the Rings: The Return of the King), our generation’s Einstein. There’s only one catch: He’s been institutionalized for the last 20 years, and the only way to question him requires pulling his estranged son, Peter (Josh Jackson, Shutter), in to help. Under Special Agent Phillip Broyles (Lance Reddick, The Wire), our trio will discover that what happened on that fatal flight is only a small piece of a larger, more shocking truth. Fringe also stars Kirk Acevedo (Oz), Blair Brown (The Days and Nights of Molly Dodd) and Jasika Nicole (The Mastersons of Manhattan). From Bad Robot Productions in association with Warner Bros. Television, Fringe premieres September 9 and airs Tuesdays at 9:00 PM on FOX. (Please note: we will clear the room between screenings. Seating is limited. Pick the screening time that works best for you!) Ballroom 20To my knowledge the episode is available on bittorrent but now you can also see it (if your early enough) while at the convetion. Let the site know if its any good.
Friday, July 11, 2008
Fringe at SDCC
The San Diego Comic-Com has released its schedule for the convention being held from July 23-27th. For the first time this year there is a "Preview Night" where several new fall TV series show their pilot episodes including Fringe.
No comments:
Post a Comment