Tuesday, July 31, 2007
A 1-18-08 Secret Revealed
The "secret" of the pictures on the 1-18-08.com site has been discovered. Turns out with a little mouse razzmatazz, by dragging a corner one way and then another, you can flip the pictures over for some text. The text then in turn reveals...well nothing that I can tell. Two of them have words, the rest are just blank.
Sunday, July 29, 2007
Few More San Diego Cloverfield Details
Mania.com has reported a little bit more information regarding Cloverfield. More of the trivia kind then anything.
- JJ Abrams inspiration came from a trip to Japan where said "We need our own Godzilla!", which supports rumors that this is a monster movie. At this point I think all the various bits of info confirm its a monster movie.
- Cloverfield comes from LA Street where Abrams has an office.
- Movie written by Lost writer Dew Goddard (not Abrams, but probably had input in it)
- Directed by Matt Reeves (co-creator of Felicity) and being shot "cinema-verite-style) on digital video. Think Blair Witch Project with better picture quality.
- Cast includes Michael Stahl-David
- Monster is not a parasite or giant robot, killing the Voltron rumors. I am inclined to believe the Slusho rumor, that's its either mutated humans or mutated ocean life.
- JJ Abrams inspiration came from a trip to Japan where said "We need our own Godzilla!", which supports rumors that this is a monster movie. At this point I think all the various bits of info confirm its a monster movie.
- Cloverfield comes from LA Street where Abrams has an office.
- Movie written by Lost writer Dew Goddard (not Abrams, but probably had input in it)
- Directed by Matt Reeves (co-creator of Felicity) and being shot "cinema-verite-style) on digital video. Think Blair Witch Project with better picture quality.
- Cast includes Michael Stahl-David
- Monster is not a parasite or giant robot, killing the Voltron rumors. I am inclined to believe the Slusho rumor, that's its either mutated humans or mutated ocean life.
Another Monstrous Poster
DarkHorizons.com has posted up another poster for Monstrous. Its the same as the previous posts, only in the largest size yet and oddly it has the Monstrous title across the top, something that JJ Abrams denied was the title of the movie. Where the image came from (ie photoshopped etc) was not indicated.
Thursday, July 26, 2007
JJ Abrams Denies Monstrous Title
A note from FirstShowing.net is indicating that the title of codename Cloverfield is not Monstrous. I think the leaked image proves that the title was at least under considering but movie titles do change names, at least until the big marketing push that usually begins about a month or so before the release date.
From JJ Abrams:
From JJ Abrams:
“I want a monster movie, I've wanted one for so long. I was in Japan with my son and all he wanted to do is go to toy stores. And we saw all these Godzilla toys, and I thought, we need our own monster, and not King Kong, King Kong's adorable. I wanted something that was just insane and intense. It's almost done shooting and I watch dailies and I'm more excited for them than the trailer, which has had an overwhelming response. We have 6 months before this comes out. We're going to have a whole bunch of things, a whole bunch more." He said a full trailer, more clips, full posters, and much more will be coming out over the next 6 monts, including the name, which he will NOT reveal today.(source)
“You think we'd call it Monstrous? No…"
Final Image of Monstrous Poster
EW.com has posted what is apparently the final teaser poster for Cloverfield aka Monstrous aka whatever the current rumor title is. Its the same image as the leaked images from yesterday but notice the title "Monstrous" is missing from the top. Also notice that with the additional clarity comes a noticeable "trail" in the water leading to a smoking New York. Hopefully a larger image will come out soon.
Subscribe to:
Posts (Atom)