Poe and BB-8 assign newly-appointed spy Kaz to the Colossus, a massive aircraft re-fueling platform on an outer rim water planet, home to colorful new aliens, droids and creatures. While undercover, Kaz works as a mechanic and lives with Poe’s old friend Yeager, a veteran pilot who operates a starship repair shop run by his crew: Tam, Neeku and their old battered astromech droid, Bucket. Kaz soon finds himself in over his head with his new friend BB-8 as he’ll have to compete in dangerous sky races, keep his mission a secret from his newfound family, and avoid the danger of the First Order.
Saturday, August 18, 2018
First Trailer, Premiere Date for Star Wars: Resistance
Here is the first trailer for Star Wars: Resistance, the new cartoon series that will premiere Sunday, October 7 at 10pm ET/PT on the Disney Channel. The series will be set before Star Wars: The Force Awakens. Here is a synopsis of the first episode:
Subscribe to:
Comments (Atom)