In a diorama called "Winter Is Hoth", three Star Wars fans used 200,000 plus Lego to re-create the Hoth Echo Base as seen in Star Wars: The Empire Strikes Back. The result include the Millennium Falcon, AT-ATs, subterranean area, and a whole lot more. To see the full set of images header over
the Flickr page or
Brothers-Brick.
No comments:
Post a Comment