... in the movie, the Cloverfield monster bites off some fucking heads. Only you get to see it from a way you don’t normally get to see heads getting bitten off, so basically the movie ... makes other head-biting-off-movies look like Georgia Rule with a peppermint cock in its ass.
The movie starts off really shitty though, with all this stuff about a young couple that’s in love, and she’s hot and he’s hot and I’m all like, “Who’s filming the Ambercrombie and Fitch catalogue?”
But then it’s like the movie heard you calling it a pussy so it puts on its dick-stomping boots and then surprises your dick with a punch from a fist wearing a cock-punch glove.
Things just don’t get scary – they get FUCKED UP. And I mean fucked up like the whole movie’s shot through a hand-held video camera, so you feel like this is happening to you (apparently, the video camera was recovered by the government, so at the beginning of the movie, when you’re told this, you think, “Man, something bad must’ve happened to whoever filmed this”, and you imagine a lot of shit, but then when you get to what ACTUALLY HAPPENS you’re like, “Fuck you, imagination, this was ten times worse than I thought” and then to get back at you your imagination makes you think about 2 Girls 1 Cup if Rhea Perlman and Edith Bunker were the girls)
So here’s the story: a monster attacks News York City.
But that’s not the fucked-up part.
The monster RIPS THE LIVING SHIT out of the city, and everyone in its path. It’s like the Iraq War and Hurricane Katrina and Kathy Griffin’s vagina combined and turned into a giant murder-beast and it’s hungry for every hip person in Manhattan.
Which is another cool thing about the movie – everyone that’s getting eaten are like characters you see in those annoying movies that are always on IFC and Fagdance.
And if that wasn’t bad enough, the giant monster starts rubbing itself on buildings, and then stuff falls off it’s gross body and crawls the fuck away – only the crawling-away stuff doesn’t stay away for long, if you know what I mean.
And then – and THEN – and I mean, at this point, the movie’s like a speed freak yelling at you, as if the giant monster and the things crawling away weren’t bad enough, there’s a third, even more messed-up thing the monster can do to a person, which I won’t spoil ‘cuz it made me kind of sick.
So, here’s my final thoughts:
The good: Monster fucking everything sideways, creepy-crawly things fucking everything that’s still not fucked, indie movie characters getting eaten and mutilated before they can talk about coffee or e-mails or their feelings.
The bad: Smarty-pants story-telling shit where the video you’re watching has un-recorded bits where you see the hero’s relationship a few weeks back, before the monster shows up. Except then there’s this final shot (from the flashback section) that’s actually kind of awesome ‘cuz it’s this very sweet, sunshine-y shot of something, except at that point you’re thinking some really bad thoughts about what the shot represents.
Tuesday, December 18, 2007
Cloverfield Monster and Story Preview
AICN strikes again in the Cloverfield department with a preview of the film from a test screening. The preview is full of cuss words and other sex based and bad analogies. Just a warning that this isn't really a work or kid safe post. Also SPOILERS lie within. So warnings aside, below is a truncated cut of the orginial post with some unrelated nonsense cut out.
No comments:
Post a Comment