According to the Hollywood Reporter, J.J. Abrams is close to signing with NBC to produce a new spy drama for the network. As is typical for Abrams, the details are under wraps but in part thanks to the success of Fringe, the networks competed in a minor bidding war for the spec script written by Abrams and Josh Reims.
All that is known about the show itself is it involves a husband and wife spy team and could lead to interesting "spy" block of programming if joined with Chuck that will return next year.
No comments:
Post a Comment