Thursday, September 10, 2015

Toy Descriptions Provide Character, Plot Details for Star Wars: The Force Awakens

With the release of the first of probably many new toys around Star Wars: The Force Awakens comes bios and descriptions that finally provide a little meat to the bone that is what little we know about the movie. Due to the descriptions we know have a little background on the characters of Finn the Stormtrooper (John Boyega) and Rey (Daisy Ridley) along with some of names of other characters and locations in the movie. Believe it or not the info below is more detail about the movie than the totality of leaks from the last year so SPOILER WARNING!

"Sometimes, heroes come from the unlikeliest of places. The Galactic Empire has been dead for decades, but evil never really dies. With villains rising to take the Empire's place, heroes must rise to oppose them.

After becoming stranded by himself in the deserts of Jakku, and meeting up with a girl named Rey, a Stormtrooper named Finn has joined the side of the Resistance. He began his adventure as a part of the New Order, but now he's one of the few people that can stop them.

With a new look, Finn is ready for a new mission. Since trading in his Stormtrooper armor for a new set of gear, Finn's outfit might not be flashy, but it's all that a hero needs to succeed."
"The mission to take down the First Order is underway! After invading the Starkiller Base, one member of the Resistance has split from her group and found herself in a massive room full of First Order soldiers.

Completely surrounded by Stormtroopers with blasters and Knights of Ren with lightsabers, she seems to be totally outnumbered. Unfortunately for her enemies, though, they've made a big mistake: it's not about the strength of the weapon, but the strength of the warrior that wields it."
Starkiller Base
"An ice planet converted into a stronghold of the First Order and armed with a fiercely destructive new weapon capable of destroying entire star systems."
New Characters
Resistance star fighter mechanic Goss Toowers and his co-worker B-U4D, Resistance tactical co-ordinator PZ-4CO, intergalactic criminal kingpin Tasu Leech, the scavenger and trader Sarco Plank, the skilled if reckless Resistance pilot Ello Asty

No comments:

Post a Comment