Cloverfield Toy Available
Hasbro has announced that the monster from Cloverfield is now available in toy form at their store (here). The item costs $99.99 plus S&H and currently no picture is available. Its says the item will ship on 09/30 but how long the pre-order will be available isn't mentioned.
According to the site:
Cloverfield Movie Monster product imagery unveiling is coming soon!
Cloverfield Monster Features:
70 points of articulation and incredible life-like detail
Authentic sound
14” tall
10 parasites
Two interchangeable heads (calm or agitated)
Statue of Liberty head accessory
Special Cloverfield collector’s edition packaging
In conjunction with the launch of the highly anticipated CLOVERFIELD movie release, Hasbro, in a partnership with Bad Robot and Paramount Pictures, has produced a super-articulated and highly detailed limited collector’s edition Cloverfield Monster.
The Cloverfield monster is available exclusively through HasbroToyShop.com. Reserve your Cloverfield monster today to have the opportunity to receive it when it ships later this year. Limited quantities are available.




4 comments:
Pls hire professional cameraman, please.
Worst movie I had in life.
After seeing movie, my wife vomited.
Movie kept shaking from begin to end.
First time I watched movie in cinema, people scold it after the show end.
okay for one the movie was supposed to be like that if you dont like it dont watch it. I though it was original and brilliant. Yes i heard complaints at the end of the showing too about how the ending was "horrible" but it was brilliant. I loved the movie from begining to end.
Post a Comment